Egypt Telecommunication Regulation Law – February 2003
Article 47 – Operator’s right to limit transmission of service to protect network
Licensed Public Networks Operators shall, after obtaining consent from the NTRA, have
the right to prevent connection of the service to Telecommunication Terminal Equipment
if it is established that such equipment have caused damage to the licensed network.
Article 48 – Type approval
The NTRA shall, without prejudice to the provisions of Article (44), determine the rules
and the procedures for approving any type of equipment and granting permits for
importing, manufacturing, usage, trade and marketing of Telecommunication Equipment
and Sets. It shall also determine the conditions, durations and charges for obtaining such
permits.
The NTRA shall issue the permit or refuse to issue such permit within a period not
exceeding 90 days from the date it receives all documents required for issuing the permit.
Importers, manufacturers, users, possessors of and traders in Telecommunication Sets
and Equipment for which permits need to be lawfully granted for the purpose of
exercising the activities prescribed in the first clause of this Article, shall harmonize their
situation by obtaining the necessary permits from the NTRA within six months from the
date of coming into force of this law.
National Telecom. Reg.Authority
20