5.4.3.2 Option (2) for generator upgrade: If the infrastructure provider
does not wish to provide for the generator upgrade, the infrastructure
seeker will need to pay for the generator upgrade. In case of the existing
generator having a Net Book Value greater than 0, one of the following two
options should be applied:
(a) The infrastructure provider reimburses the net book value to the
infrastructure seeker; or
(b) The infrastructure provider transfers the old generator to the
infrastructure seeker.
In either case, the infrastructure provider will be responsible for operation
and maintenance of the upgraded generator and the monthly fees of
Annex F section (II.) are applicable.
5.4.4 Considering that infrastructure costs show relatively small variations
over time (in Dollar terms), and since these infrastructure costs comprise
the largest part of the service cost, RURA expects that the service prices in
Annex F remain valid for a 3 year period, starting with the effective date
of these guidelines. RURA reserves the right to review prices at any time, if
sufficient evidence arises to justify a modification.
16