ORSB – ANGOLA COUNTRY STRATEGY PAPER 2011 - 2015
1
2
3
4
5
6
7
8
Government
Strategic
Objectives
Constraints to
achieving the
desired
outcomes
Final Outcome
Indicators (2015)
Final Output
Indicators (2015)
Midterm Output
and Outcome
Indicators (2013)
Key Actions
Proposed ADB
Interventions in
the CSP and
Ongoing
Interventions
Key Risks
(2013)
To
implementation
/ Mitigation
measures
Power
Sustainable and
reliable energy
supply to support
private sector
development
growth
• Lack of
adequate
power
generation,
transmission
and
distribution
capacity
• Lack of
technical
capacity in
project
implementatio
n & system
operation
Increase
generation
capacity from by
1125MW 2011 to
1711MW in 2015
Increasing access
to electricity by
20% 2011
586 MW of
generation
commissioned
200 KM of
transmission lines
completed
Approval and
endorsement of the
Power Sector
Master Plan
• Support for
the Power
Sector
Master Plan,
•
Completed
feasibility studies for
•
Complete project
procurement
• Support for
the feasibility
studies
• Comprehensive
Power Sector
master Plan
developed and
priority projects
identified
•
• Feasibilities
carried out
Power no longer is
identified in ICA as
number 1 constrain
to private sector
activity
• Support for
the
implementati
on of the
projects
• GOVEMatala220kV,
200km
transmission
line,
• GTG 3 40MW
Thermal
Power
Station
Cazenga,
• Expansion of
Cambambe
HPS
(4x130MW),
• 22MW Wind &
4MW solar
6
Risk:
(i) Delay in the
preparation and
Approval of
Master Plan&
Feasibility
studies
(ii) Lack of
technical
expertise
Mitigation:
(ii) Work closely
with Ministry of
Planning &
Ministry of
Energy & Water
through out
project planning
and
implementation
(ii) Capacity
building project
& external
sourcing will
reduce this
constraint