Skip to main content
completion of all tasks related to establishing a joint presence at the existing mobile site. 4.2.5.2 The cost of adapting an existing mobile site to accommodate another Licensee’s facilities shall be borne by the Licensee which is requesting to share the existing mobile site save costs for depreciated materials. 5. Price-Setting for Passive Infrastructure Sharing 5.1 Site categories 5.1.1 In order to determine maximum prices for passive infrastructure sharing, RURA examined the actual cost of passive infrastructure sharing for access to towers as well as access to electricity (both, grid and generator power). This cost study has taken into consideration the most common configurations based on lattice towers in three categories for heights, and site configurations with and without access to the electricity grid. 5.1.2 The three categories for lattice towers are: - towers with heights below 30 meters - towers with heights between 30 and 50 meters - towers with heights above 50 meters 5.1.3 The categories for power access are: - mobile sites with equipment room and access to the electricity grid - mobile sites with outdoor installations and with access to the electricity grid - mobile sites with outdoor installations and without electricity grid access 5.2 Price setting methodologies 5.2.1 When determining the maximum prices for tower and electricity access sharing, RURA took into consideration different approaches for price setting, such as - leaving price-setting to the market, i.e. based on negotiations between licensees - price-setting based on benchmarking - cost-based price setting 13

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents