III.

NOTES ON STEPS AND RATIONALE

A. Operator applies for permission to install communication infrastructure
from the licensing authority (RURA) in accordance with article 47 of the
telecom law. The applicants will be required to provide the following set
of documents along with their applications to RURA:
1. Site Design Description











A brief description of the proposed site: Location and size
of facilities and accessory equipment, size and boundaries
(applicable to the tower only) existing and proposed
topography, legal description of the proposed site;
Structural and engineering designs and drawings at a scale
of at least 1:100. These should be prepared by registered
engineering firms.
Architectural elevation drawings (with true north arrow
indicated) of all equipment indicating materials, overall
exterior dimensions and colors of structures;
Setback and height requirements of the facility
Location and size of existing structures, vegetation (if any)
and location and size of proposed improvements, including
any landscaping, location and size of access roads to the
facility;
Existing utility easements and other rights of way on record
(if any)
Zoning and uses of properties adjacent to the proposed site
(i.e. within a radius of 100 meters from the site);
Landscaping plan showing landscape material, parking,
method of fencing, finishing color, if applicable, method of
camouflage and illumination.

2. Vicinity Map of the Area: The vicinity map should show the
location of existing and planned wireless communication facilities
belonging to the applicant or other communication service
providers within 1 kilometers of the proposed site.
3. Project Proposal: The project proposal should provide details
pertaining to the following in a narrative form:




The applicant and surface owner’s names, addresses,
signatures (and designation of agents if applicable) with
proof of ownership or lease agreement in a form
acceptable to the local district/municipality.
An explanation of the need for such a facility, operating
plan and proposed coverage area.

24

Select target paragraph3