FIRST SCHEDULE
CONTENTS OF REFERENCE OFFER
(a) General Sharing Issues
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
(xiii)

Access and refusal
Separation
Standardization
Re-development/Re-location
Study and preparatory work
Requirements of access seeker
Commencement/duration/renewal
Liability
Insurance
Confidentiality
Security
Arbitration
Modification/Termination

(b) Provisioning
(i)
Time schedules
(ii) Information requirements
(iii) Constructional specifications
(iv) Technical Specifications
(v) Delivery of Access
(vi) Testing
(c) Operation
(i)
Requirements on equipment
(ii) Installation of equipment
(iii) Inspection and Maintenance
(iv) Fault clearance
(v) Access conditions of persons
(vi) Removal of abandoned or unusable towers
(vii) Signage

23 | P a g e