ORSB – ANGOLA COUNTRY STRATEGY PAPER 2011 - 2015
ANNEX 4 – The Bank Group’s 2011-2015 Indicative Operations for Angola
The Indicative Lending Program
Project Title
Amount
Finance
Pillar I: Stimulus to the Competitiveness of the economy
2011
LOC to a Commercial bank to finance SME credit
100
ADB Private
Support to Mrkt Oriented Fisheries
20
ADB Sovereign
2012
PSD Policy & Inst. Reform
Micro-Finance Whole Sale Fund and Capacity Building
TOTAL Financing with ADB and ADF-12 funds
4
ADF-12 loan
20
ADB Private
Sector
Financial
Fisheries
MultiSector
Financial
UA 144 million
Pillar II: Support to Economic Infrastructure Development
2011
Combined Solar & Windfarm Power Generation
50
ADB Sovereign
Feasibility and Preparation Studies for Infrastructure Projects
10
ADB Sovereign
(Road Lucusse – Zambia; Railway Namibe – Lubamgo – Oshikango)
2012
nd
2 Power Station Cambambe (4x130) with Public-Private Partnership
3-Lines Railways National Interconnection
2013
Power
Transport
200
4
ADB Private
Power
GTG 3 Cazenga Rehab Thermal Generation .
50
ADB Sovereign
Power
Economic Infrastructure Maintenance
15
ADF-12 Loan
Inst.
Support
TOTAL Financing with ADB and ADF-12 funds
UA 329 million
Note: Amounts are in UA and refer to the total amount of the projects; Projects that could derive from studies and so are yet to be confirmed, have not been
included on the lending program;
The Indicative Non-Lending Program
Project Title
Amount
Finance
Sector
Pillar I: Stimulus to the Competitiveness of the economy
2011
ICBPR Project
(Including Economic Diversification Study)
PPP unit at MINEC
2012
Domestic Resource Mobilization Study
TOTAL
6
ADF-11 grant
Inst. Support
2
MIC Grant
Inst. Support
0.3
8.3
Trust Fund
ESW
Pillar II: Support to Economic Infrastructure Development
2011
National Electric Master Plan Study
5
MIC Grant
2012
CFM – Zambia Interconnection Study
4
ADB Sovereign
Sea Port Strategy Study
4
MIC Grant
2013
Clean Energy Master Plan
0.5
Trust Fund
13.5
TOTAL
Power
Rail Line
Maritime
ESW
Note: Amounts are in UA and refer to the total amount of the projects; Projects that could derive from studies and so are yet to be confirmed, have not been
included on the lending program;
Finance window Acronyms: ADB Sovereign – ADB sovereign loan; ADB private – ADB non-sovereign loan; MIC Grant – Middle Income Country Grant;
18