3.0 Plan-Specific Actions and Time-Bound Measurable (TBM) Targets

Plan-Specific Actions

I2.1

Implement programme of National Road
Network, expansion, rehabilitation and
upgrade

Plan-Action Prerequisites
and Linkages
Prerequisites:
Non
Plan-Action Linkages:

Time-Bound Measurable Targets

Plan-Action
Implementation Agency

Carryout
on-going
expansion,
rehabilitation and upgrade of the
National Road Network during the time
frame of NICI-2005

Ministry of Transport
Public Works and
Communications

Privatize Road maintenance by 2002

Ministry of Transport
Public Works and
Communications

Non
Prerequisites:
I2.2

Implement programme to privatize Road
maintenance and set-up a Road maintenance
fund.

Non
Set-up a Road maintenance fund by 2002
Plan-Action Linkages:
Non
Develop a programme for urban and
rural electrification by 2001

Prerequisites:
Non
I2.3

Develop and implement a comprehensive
urban and rural electrification programme

Target achieving at least 75% coverage
of electricity in urban areas by 2005

Ministry of Energy,
Water and Natural
Resources

Plan-Action Linkages:
Target achieving at least 50% coverage
of electricity in rural areas (medium and
high density rural settlements) by 2005

Non