Provider Reference Infrastructure Sharing Offer

______________________________________________________________________

“Infrastructure Seeker”: The Party entering into this Agreement with Provider.
“Infrastructure Seeker Network”: The total infrastructure operated by the Infrastructure
Seeker to provide telecommunications services.
“Infrastructure Seeker System”: The Network provided by the Infrastructure Seeker for
connection to the Provider System pursuant to this Agreement.
“Order”: A binding request for Service from the Infrastructure Seeker to Provider,
submitted in accordance with the processes documented in this Agreement and in the
Operations and Maintenance Manual.
“Party”: A party to this Agreement.
“Physical Co-Location”: an arrangement under which the Infrastructure Seeker‟s
Compliant Equipment is located at a Provider‟s Site.
“Physical Co-Location Facility”: The location at which Physical Co-Location is provided.
“PSTN”: Public Switched Telecommunications Network
“Ready for Service Date”: The date by which an ordered Service or other activity
requested by the Infrastructure Seeker is requested to be available.
“Receiving Party”: A Party who received any information from the other Party in relation
to this Agreement.
“Service(s)”: the services described in the Service Schedules at Annex C to this
Agreement as amended from time to time.
“Service Schedules”: The Schedules attached at Annex C which describe the
Services.
“Specification”: any of the specifications in this Agreement together with any other
relevant specifications for the provision of Infrastructure Sharing services.
“Specified Floor Area”: a floor area or areas within a Provider Site occupied by the
Infrastructure Seeker where the Infrastructure Seeker‟s Compliant Equipment is
installed, specified against the Provider Site
“Subsidiary”: a Company in the case of which the conditions ascribed to it in the
Companies Law are met.
“System Alteration��: a change to the Provider System, not including a change to an
interface, which may materially affect service(s) of an Infrastructure Seeker.
“System”: The Provider System or, as the context requires, the Infrastructure Seeker
System.
“Technical Manual”: A document describing technical aspects of the Services provided
under this Agreement

DATE

Page 4

Select target paragraph3