Activities:
1. Develop legal, regulatory and institutional framework
2. Develop and implement a technical framework
3. Develop an implementation plan
4. Build local capacity to manage CNS-ATM
5. Acquire and deploy CNS-ATM equipment
6. Increase awareness and sensitization around this initiative within the region
Expected Outcome:
1. Improved national and regional airspace safety and security
2. Improved airspace and airport operational efficiency
3. Increased availability of user-preferred flight schedules and profiles thereby positioning
Rwanda as a logistics hub
4. Minimised deferring of equipment carriage in the region
5. Generate income for the country
6. Elevate Rwanda’s ICT status
Outcome Indicators:
1. CNS-ATM fully operational by 2013
2. Number of flights to Rwanda
3. Number of incidents in flight control
Page 67 of 85
© No part of this document can be reproduced, stored in a retrieval system, or transmitted in any form or by any means - electronic,
mechanical, photocopying, recording, or otherwise - without the permission of Rwanda Ministry in charge of ICT in the Office of the
President.
Select target paragraph3