1007 
(4) In  the  case  of   application  by a  telecommunications services  operator or provider who  wishes to  supply 
CPE also it is sufficient to attach a report specifying­ 
(a) 

that type­approval tests were carried out; and 

(b) 

whether the results  were acceptable. 

(5)  Telecommunication  services  operators  or  providers  shall  perform  acceptance  testing  of   all  customer 
installations  (e.g.  reticulation,  PBAX  extensions  wiring) to  be  interfaced  with  their network to  ascertain  that 
such  installations  meet  required  standards  before  connection  and  each  installation  shall  be  individually 
certified and a certificate issued. 
(6)  Charges  related  to  acceptance  testing  of   installations  shall  be  part  of  the  tariffs  of  the 
telecommunications services operator or provider and has to be  approved by the Authority. Charges related 
to  acceptance  testing  if   CPE.  installations  at  the  customer premises shall  be  included  in  the  Agreement  to 
be concluded between the telecommunications services operator or provider and the CPE Provider. 
Ownership and maintenance of CPE 
146. (1) the ownership of the CPE and responsibility for its maintenance are that of the customer. However, 
nothing  in  this  Rule  excludes  conclusion  of  an  agreement  between  the  customer and  the  CPE provider to 
arrange rental services or any another alternative 
(2) Any CPE Provider supplying any type of terminal equipment or service shall build the capacity to service 
or maintain or replace that type of equipment & service within 48 hrs of reporting of the fault with it 
(3) All terminal equipment shall be easily repairable by the CPE Provider or immediately exchangeable for a 
similar type permanently or as a temporary measure while awaiting repair to the non­working one 
(4) Terminal  equipment is  not  permanently exchangeable for an  older model  or a model  with less  or poorer 
facilities than the one to be repaired 
(5) Notwithstanding the provisions contemplated in sub­rules (1) to (4), the customer and CPE Provider may 
still  decide  on  a  solution  acceptable  to  both  parties  regarding  the  exchange  or  replacement  of  a  faulty 
terminal equipment 
(6) CPE Providers shall supply the terminal equipment or provide service to the public without discrimination

Select target paragraph3