Up to 50% of the height of an existing tower may be replaced with no increase
in height as part of modifications made to provide for co-location of a new
facility. Replacement of more than 50% shall be considered as a new tower and
shall meet all of the applicable requirements.
4.1.7.2 Rebuilding damaged or destroyed existing site
Existing towers and facilities that are damaged or destroyed may be rebuilt
through administrative review and approval, provided the replacement tower
or facility is the same as the original in type, location and capacity or brings a
previously nonconforming tower or facility into greater conformance and no
more than 50% of the tower or facility is involved.
If more than 50% of the tower or facility is involved, it shall be considered as a
new facility that shall meet all of the applicable requirements. A damaged or
destroyed tower not rebuilt in 180 days shall be considered abandoned.

4.1.8 Removal of abandoned or unusable facility
In the event the use of a tower is discontinued by the tower owner, or in the
event a tower owner files notice to RURA of its interest to cease operating, the
tower owner shall provide written notice of its intent to discontinue use and
the date when the use shall be discontinued.
4.1.8.1 Any facility deemed abandoned pursuant to these guidelines or any
facility that is not operated for a continuous period of twelve months shall be
considered abandoned, and the owner or last operator shall remove it within
ninety days of receipt of written notice to remove from RURA. Failure to
remove an abandoned tower or facility within ninety days shall be grounds to
remove it at the owner’s or last operator’s expense. If there are two or more
users of a single tower or facility, then this provision shall not become
effective until all users cease using it.

4.1.9 Non-conforming structures
After coming into force of these guidelines, any wireless communication
facilities, which have been located, constructed or modified without first
obtaining the required permit or any necessary authorization, shall be ordered
to be removed.