iii.
Reach an agreement with RURA or its representative, where
applicable and necessary, on all matters relating to the
collocation of any IGTVS equipment;
iv.
Having an agreement, where applicable, on all the required
network and service parameters for the purposes of these
Regulations;
v.
Identify and appoint a member of their staff as their
representative for the special committee in line with these
Regulations;
vi.
Assist RURA’s representatives in the conduct of any survey for
the purposes of these Regulations;
vii.
Having an identified place or space for connection and
collocation of the Interconnect Border Control System (IBCS);
viii.
Identified all requirements for the connectivity of the IBCS to
the switch and networks of the concerned operators;
ix.
An established and complete network with a functional and
operational IGTVS;
x.
Any other thing or requirement further identified by RURA that
has the effect of ensuring the effective and efficient
implementation of the IGTVS as conceived by these
Regulations;
c) The transitional period begins from date of approval and signature by
the Regulatory Board.
d) It shall be considered as a serious breach on the part of a concerned licensed
operator who fails to achieve any of the above transitional terms and or
comply with any requirement identified by RURA during the course of the
transitional period.
ARTICLE 18 REPEALING PROVISION
All previous provisions or regulations governing, determining or relating
to gateway and international incoming electronic communication traffic
contrary to these Regulations are hereby repealed.
ARTICLE 19 PUBLICATION
These regulations shall be published on RURA website and in the
Official Gazette of the Republic of Rwanda.
Regulations for International Gateway Traffic Verification System for Network Operators in Rwanda