Skip to main content
ORSB – ANGOLA COUNTRY STRATEGY PAPER 2011 - 2015 2.2.6 Angola faces challenging gender issues as reflected by the 2009 gender index gap score of 106 (out of 134 countries). Women in Angola enjoy a high degree of civil liberties and a dedicated ministry to family and women affairs exists. However, women are weakly protected when it comes to issues such as violence, divorce and inheritance. There is a huge asymmetry in literacy rates. program that can accommodate the country’s new development goals. Figure 4 - Public Investment Program 2010 Table 4- Gender Balance Indicators Indicator Labor force participation literacy rates Parliament Seats Balance Cabinet Balance Male 76% 83% 63% 70% Female 90% 54% 37% 30% Source: IMF 2010, Projected External Borrowing by contracts 2.3.2 Electricity shortages are a crosscutting constraint to the country’s development. Despite the estimated hydroelectric potential of 18,000 mw, only 20 percent of the population has access to electric power, and lack of electricity is considered the first constraint to business (68 percent of businesses resort to private diesel generators). At present hydroelectric power provides two third of energy supply and diesel generators provide the remainder. Strong government investment has boosted generation and on-going projects will double the hydroelectric output. The transmission and distribution grid have unfortunately not kept pace resulting in common power shortages. Source: Ministerio da Familia e Mulher -. MINFAMU 2009 Females fare relatively better in terms of labor force participation and political representation both at the Government cabinet level and in terms of parliament seats (see Table 4). The Bank concluded a Gender profile in 2008. 2.3 Business Environment Context Infrastructure 2.3.1 Decades of internal strife have resulted in the destruction or deterioration of the physical infrastructure, compromising the country’s social and economic cohesion, and its regional integration agenda. The rehabilitation /reconstruction of the existing infrastructure has been, since 2002, the upmost national priority to support economic recovery, the delivery of essential public services and to assist the implementation of policy reforms. Despite the remarkable ongoing effort to reconstruct and rehabilitate infrastructure, there is a need to plan beyond and develop an expansion 2.3.3 The pre-war transport network served national routes as well as transport corridors for minerals from Democratic Republic of Congo (DRC) and Zambia. The road grid comprises a total of 73,000km, of which 23,000km designated as principal network (PI). Some 5,000km (21 percent of the PI) was reconstructed to bitumen standards in the past 6 years, with an additional 6.000km under upgrading. None of 9

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents