Skip to main content
    An explanation of the applicant’s knowledge of alternatives to the proposed site and why these other sites are not preferred to the proposed one. An explanation of how the proposed site infrastructure development blends with natural features in the area and is compatible with surrounding structures (including existing buildings and other towers in the area). An explanation of compatibility with the city masterplan, zoning and urban design guidelines. Visual analysis: All applicants shall provide photo montage (perspective) showing how the site with proposed infrastructure will look on the land so as to identify the potential visual impacts of the proposed facility. B. The Letter of no objection from RURA must be obtained before any other authority is approached. This letter should affirm the following: 1. That the proposed facility alone or in combination with other facilities will comply with RURA standards for cumulative field measurements of radio frequency power densities and electromagnetic radiation fields (Referring to ICNIRP Guidelines and ITU standards on EMR thresholds) 2. That the facility will comply at all times with RURA regulations and ITU standards prohibiting localized interference with other licensed frequency users. C. RURA requests for zoning clearance and site development authorization from the local authority (LA) and Environmental Compliance Clearance from RDB/ENVIRONMENTAL COMPLIANCE. The following documents shall be sent by RURA to the LA and RDB/Environmental Compliance: 1. A Letter of no objection from RURA shall be addressed to the LA and RDB/ENVIRONMENTAL COMPLIANCE, recommending the applicant’s request for permission to develop the site (article 47 of the telecom law). The applicant shall receive a copy of the request for permission for close follow up. 2. All documents submitted to RURA by the operator as described in STEP-A above. D. The Local authority will subject site development application to all other requirements as is currently the case and grant or deny approval. The applicant must obtain clearance from the LA with regard to zoning requirements before submitting project report to RDB/ENVIRONMENTAL COMPLIANCE. The LA must quote the RURA reference of the letter of no objection and capture site coordinate information in its authorization. 25

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents