Skip to main content
III. NOTES ON STEPS AND RATIONALE A. Operator applies for permission to install communication infrastructure from the licensing authority (RURA) in accordance with article 47 of the telecom law. The applicants will be required to provide the following set of documents along with their applications to RURA: 1. Site Design Description         A brief description of the proposed site: Location and size of facilities and accessory equipment, size and boundaries (applicable to the tower only) existing and proposed topography, legal description of the proposed site; Structural and engineering designs and drawings at a scale of at least 1:100. These should be prepared by registered engineering firms. Architectural elevation drawings (with true north arrow indicated) of all equipment indicating materials, overall exterior dimensions and colors of structures; Setback and height requirements of the facility Location and size of existing structures, vegetation (if any) and location and size of proposed improvements, including any landscaping, location and size of access roads to the facility; Existing utility easements and other rights of way on record (if any) Zoning and uses of properties adjacent to the proposed site (i.e. within a radius of 100 meters from the site); Landscaping plan showing landscape material, parking, method of fencing, finishing color, if applicable, method of camouflage and illumination. 2. Vicinity Map of the Area: The vicinity map should show the location of existing and planned wireless communication facilities belonging to the applicant or other communication service providers within 1 kilometers of the proposed site. 3. Project Proposal: The project proposal should provide details pertaining to the following in a narrative form:   The applicant and surface owner’s names, addresses, signatures (and designation of agents if applicable) with proof of ownership or lease agreement in a form acceptable to the local district/municipality. An explanation of the need for such a facility, operating plan and proposed coverage area. 24

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents