Type of Lattice Tower: Tower1:
Tower2:
Tower3:
<30m
30m..50m
>50m
TOTAL SERVICE COST
21,898
23,311
30,102
(in USD per year)
912
971
1,254
Monthly Cost when sharing
between 2 operators (USD):

Regarding access to electrical power, there are three typical configurations
(based on operator inputs): locations with an equipment room and access to
the electricity grid, locations with outdoor installation and grid access, and
outdoor locations without grid access (making use of power generators only). In
the latter case, all assets related to power generation have been put in the
“short life” category applying a 4 year asset life to the cost annualization.
The following table shows the results of the weighted average cost categories
for electricity access at a tower location in Rwanda, based on these operator
inputs. OPEX figures include the additional electricity and fuel usage to serve a
second operator.

CAPEX:

OPEX:

Type of Electricity Access: Equipment
External site External site
room
with grid
with-out grid
(all cost figures in US-Dollar)
with grid
access
access
access
Material, Acquisition,
10,722
11,713
9,856
Installation (long life)
Generator, incl. Installation
16,457
17,942
0
(long life)
Generator, incl. Installation
0
0
16,747
(short life)
Total annual OPEX:
20,535
21,180
49,311

Applying annualization factors leads to the following fully-allocated service
costs for electricity access. The monthly costs for tower sharing are derived by
dividing these annual costs by 12 and again by 2, assuming sharing between two
operators.
Type of Electricity Access: Equipment
External site
External site
room
with grid
with-out grid
with grid
access
access
access
TOTAL SERVICE COST
26,592
27,789
57,373
(annual) [Annuity]
1,108
1,158
2,391
Monthly Cost when sharing
between 2 operators:

33